    Phillip - was wondering if you are in your new building yet? If so I (we) would love to see some pictures....Thanks Mark
     
  2. phillipd

    phillipd Moderator Staff Member MSGO Supporter

    12,966
    44,381
    columbus
    Nope. Slab was done 6 weeks ago. Building is paid for. Still waiting on the building guy to show up. He keeps putting us off. Bo talked to him yesterday in a not friendly manner and supposedly he will be here in a week or so. If not then I’ll be making a trip to Pontotoc. I’m tired of the bs and ready for a building and I want either it, the money, or some satisfaction soon. If we hadn’t dealt with this builder in the past and been pleased then I wouldn’t have been this patient
     
    Soonered, Mesquite, SubGunFan and 5 others like this.

  3. Sigarmsp226

    Sigarmsp226 Active Member MSGO Supporter

    36
    112
    Columbus
    Man I am sorry to hear this because while visiting with you in Hattiesburg I could tell how excited you were to get into it....Hang in there and if you decide you need to open up a can of woop-ass I think I know about 300+ Members that would show up to help........Mark
     
    Soonered, Evan, Mesquite and 5 others like this.
  4. phillipd

    phillipd Moderator Staff Member MSGO Supporter

    12,966
    44,381
    columbus
    Heard from the contractor today and supposedly the building will be delivered a week from today
     
  5. deadhead

    deadhead Distinguished Poster MSGO Supporter

  6. Jarhead5811

    Jarhead5811 Rational Anarchist MSGO Supporter

  7. para40

    para40 Curmudgeon extraordinaire MSGO Supporter

    7,968
    36,873
    Lamar Co.
    He is busy earning a living the hard way.
    Prayers for
    phillipd.
     
    Soonered, oldguns, Ellis93 and 4 others like this.
  8. phillipd

    phillipd Moderator Staff Member MSGO Supporter

    12,966
    44,381
    columbus
    Ok here’s an update. Building has been up for a couple months but between working on the road and weather have been slow getting it done. As of tonight all the electrical conduit to pass inspection is done and we pulled 2 runs of wire. Too wet to tie in water and sewer. One baby step at a time. I was holding off on posting pix til all the lighting was done. Right now we’re running on 2 of 7 overhead lights and extension cords.
     
  9. phillipd

    phillipd Moderator Staff Member MSGO Supporter

    12,966
    44,381
    columbus
    Coming soon I hope
     
  10. phillipd

    phillipd Moderator Staff Member MSGO Supporter

    12,966
    44,381
    columbus
  11. phillipd

    phillipd Moderator Staff Member MSGO Supporter

    12,966
    44,381
    columbus
    Made the sewer tie in 6’ deep and got water to building today. We dug a bell hole I could’ve buried my truck in. Running two frost proof faucets on Saturday and the plumbing will be done. Off to the ER in Starkville tomorrow
     
    deadhead, Mesquite, oldguns and 7 others like this.
  12. DoyleAlley

    DoyleAlley Distinguished Poster

    So, you decided to go back to OCH? Full time or contract?
     
    phillipd and Mesquite like this.
  13. phillipd

    phillipd Moderator Staff Member MSGO Supporter

    12,966
    44,381
    columbus
    Just every now and then
     
  14. Sigarmsp226

    Sigarmsp226 Active Member MSGO Supporter

    36
    112
    Columbus
    Phillip - You in your new building now? I am ready to come visit...Mark
     
  15. phillipd

    phillipd Moderator Staff Member MSGO Supporter

    12,966
    44,381
    columbus
    Mark I’m about 90%. You can come anytime. The rain is killing me. I’ve been trying to pour the slab for the powder coating oven for 2 months. The plasma table is up and running, bandsaw is like new, and I’m set up to weld. Just need to build the oven and buy a sand blasting cabinet to be operational
     
  16. phillipd

    phillipd Moderator Staff Member MSGO Supporter

    12,966
    44,381
    columbus
    If weather cooperates I’ll have my slab for the oven tomorrow 3A8D7E7F-5E70-44C7-AEAE-49BD6CBC358E.jpeg
     
    Last edited: Apr 29, 2020
  17. DEADEYE 1

    DEADEYE 1 Distinguished Poster MSGO Supporter

    You are heading for the finish line now.
     
    phillipd and LeansVeryRight2016 like this.
  18. phillipd

    phillipd Moderator Staff Member MSGO Supporter

    12,966
    44,381
    columbus
    Got the walls up today and hopefully the roof and back doors tomorrow
     